Two flights, one side-by-side record — dated, geotagged aerial proof of what changed. Contractors use it to get paid without disputes; owners use it as a pre-storm baseline that makes future claims clean.
Request Before/After Documentation See a Sample ReportA before/after package pairs a baseline flight with a completion (or post-event) flight, matched shot-for-shot and delivered as a side-by-side PDF. Roofers and restoration contractors close out jobs with visual proof of scope completed; property owners document conditions before storm season or before a neighbor’s construction project starts.
Visual documentation services · not a substitute for licensed engineering or land surveying (N.C. Gen. Stat. Ch. 89C).
Whenever the change is complete — project close-out, post-storm, or seasonally. The two flights can be days or months apart; MW AIRLIFT™ stores the baseline so the comparison is ready when you are.
Roofing and restoration contractors (scope proof for payment), solar installers (pre/post array condition), property managers (turnover records), and homeowners establishing a pre-storm-season baseline.
Before/after packages range from $300 to $500 covering both flights and the side-by-side PDF. Measurement reports (from $60) and orthomosaic maps (+$150–$300) can be added to either capture.
Yes — a dated pre-event baseline paired with post-event imagery is among the strongest visual evidence a claim can carry. For active claims, see our insurance support package, which formats everything adjuster-ready.
Raleigh, the Triangle, and communities across North Carolina. Contact us to confirm scheduling for your address.
Two flights, one undeniable record — across Raleigh and North Carolina.